Myanmar/Malaysia-India-Singapore Transit (MIST) Submarine Cable System
Recently, the union environment ministry’s expert appraisal committee (EAC) on Coastal Regulation Zone (CRZ) matters has given its go-ahead for the construction of Myanmar/ Malaysia- India- Singapore Transit (MIST) Submarine Cable System.
About MIST Submarine Cable System
- It has a total length of 8,100km, connecting Singapore, Malaysia, Myanmar, Thailand, India (Mumbai and Chennai).
- It is being executed by the global technology provider NEC Corp.
- This will be the 17th such optical fibre cable system to land in Mumbai, and is expected to be ready for service sometime in 2023.
- Out of the total 8,100km length of the cable system, about ....
Do You Want to Read More?
Subscribe Now
Take Annual Subscription and get the following Advantage
The annual members of the Civil Services Chronicle can read the monthly content of the magazine as well as the Chronicle magazine archives.
Readers can study all the material before the last six months of the Civil Services Chronicle monthly issue in the form of Chronicle magazine archives.
Related Content
- 1 Botswana
- 2 Georgia
- 3 Ethiopia
- 4 International Migration Outlook
- 5 India, Israel Sign Pact to Boost Defence Ties
- 6 India-Saudi Arabia Sign Bilateral Haj Agreement for 2026
- 7 India, Nepal Sign LoE to Expand Rail-Based Transit Routes
- 8 India, Canada Formally Resume CEPA Talks
- 9 Jakarta Becomes the World’s Most Populated City
- 10 7th NSA-level Meeting of the Colombo Security Conclave

